Jump to content

T10: Difference between revisions

From Alexrules14's Wiki
Alexrules14 (talk | contribs)
No edit summary
Alexrules14 (talk | contribs)
No edit summary
Line 16: Line 16:
*[[Woodgrange Park]] ]||[ (at-grade, staggered)
*[[Woodgrange Park]] ]||[ (at-grade, staggered)
*[[Stour Junction]] |[]|[]||[ (at-grade)
*[[Stour Junction]] |[]|[]||[ (at-grade)
==Rolling stock==
*3x [[QR1-Series]]
[[Category:City2connect Wiki]]
[[Category:City2connect Wiki]]

Revision as of 18:42, 1 January 2025

The T10 is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by City2connect. The line was opened on 25 December 2021.

On 27 October 2024, the T10 line was updated with new lightning, relaid track around Wheatfield & Talbot Parkway, detail changes at Talbot Parkway, fixed a few points where trains could get stuck, and preparations for a new feature.

Stations

Rolling stock