T10: Difference between revisions
Appearance
Alexrules14 (talk | contribs) No edit summary |
Alexrules14 (talk | contribs) No edit summary |
||
Line 16: | Line 16: | ||
*[[Woodgrange Park]] ]||[ (at-grade, staggered) | *[[Woodgrange Park]] ]||[ (at-grade, staggered) | ||
*[[Stour Junction]] |[]|[]||[ (at-grade) | *[[Stour Junction]] |[]|[]||[ (at-grade) | ||
==Rolling stock== | |||
*3x [[QR1-Series]] | |||
[[Category:City2connect Wiki]] | [[Category:City2connect Wiki]] |
Revision as of 18:42, 1 January 2025
The T10 is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by City2connect. The line was opened on 25 December 2021.
On 27 October 2024, the T10 line was updated with new lightning, relaid track around Wheatfield & Talbot Parkway, detail changes at Talbot Parkway, fixed a few points where trains could get stuck, and preparations for a new feature.
Stations
- Centre ]|| (at-grade, located on an unused switch)
- Deansgate Road (unused)]|[]| (at-grade)
- Abbey Road ]| |[ (at-grade)
- Forest Gate ]|]||[ (at-grade, staggered)
- Needle Road |[]| (at-grade)
- Salter Road ]||[ (underground)
- Hendon Road |[]||[ (at-grade)
- Millgate ]||[ (at-grade, staggered)
- Heathway Park ]||[ (at-grade) (orignally ]||[ and street running)
- Wheatfield ]||[ (at-grade, staggered)
- Talbot Parkway 1]||[2 (at-grade)
- Woodgrange Park ]||[ (at-grade, staggered)
- Stour Junction |[]|[]||[ (at-grade)
Rolling stock
- 3x QR1-Series