Jump to content

T10: Difference between revisions

From Alexrules14's Wiki
Alexrules14 (talk | contribs)
Created page with "The '''T10''' is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by City2connect. The line was opened on 25 December 2021. ==Stations== *Centre ]|| (at-grade, located on an unused switch) *Deansgate Road (unused)]|[]| (at-grade) *Abbey Road ]| |[ (at-grade) *Forest Gate ]|]||[ (at-grade, staggered) *Needle Road |[]| (at-grade) *Salter Road ]||[ (underground) *Hendon..."
 
Alexrules14 (talk | contribs)
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
The '''T10''' is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by [[City2connect]]. The line was opened on 25 December 2021.
The '''T10''' is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by [[City2connect]]. The line was opened on 25 December 2021.
On 27 October 2024, the T10 line was updated with new lightning, relaid track around Wheatfield & Talbot Parkway, detail changes at Talbot Parkway, fixed a few points where trains could get stuck, and preparations for a new feature.
==Stations==
==Stations==
*[[Centre]] ]|| (at-grade, located on an unused switch)
*[[Centre]] ]|| (at-grade, located on an unused switch)
Line 13: Line 15:
*[[Talbot Parkway]] 1]||[2 (at-grade)
*[[Talbot Parkway]] 1]||[2 (at-grade)
*[[Woodgrange Park]] ]||[ (at-grade, staggered)
*[[Woodgrange Park]] ]||[ (at-grade, staggered)
*[[Stour Junction]] |[]|[]||[ (at-grade)
*[[Stour Junction]] |[4b 4a]⊥[32]||[1 (at-grade)
Branch splits
*TBA |[]⊥[]||[ (at-grade)
===TBA branch===
*TBA ]| (at-grade)
==Rolling stock==
*3x [[QR1-Series]]
[[Category:City2connect Wiki]]
[[Category:City2connect Wiki]]

Latest revision as of 19:38, 1 January 2025

The T10 is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by City2connect. The line was opened on 25 December 2021.

On 27 October 2024, the T10 line was updated with new lightning, relaid track around Wheatfield & Talbot Parkway, detail changes at Talbot Parkway, fixed a few points where trains could get stuck, and preparations for a new feature.

Stations[edit | edit source]

Branch splits

  • TBA |[]⊥[]||[ (at-grade)

TBA branch[edit | edit source]

  • TBA ]| (at-grade)

Rolling stock[edit | edit source]