T10: Difference between revisions
Alexrules14 (talk | contribs) Created page with "The '''T10''' is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by City2connect. The line was opened on 25 December 2021. ==Stations== *Centre ]|| (at-grade, located on an unused switch) *Deansgate Road (unused)]|[]| (at-grade) *Abbey Road ]| |[ (at-grade) *Forest Gate ]|]||[ (at-grade, staggered) *Needle Road |[]| (at-grade) *Salter Road ]||[ (underground) *Hendon..." |
Alexrules14 (talk | contribs) No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The '''T10''' is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by [[City2connect]]. The line was opened on 25 December 2021. | The '''T10''' is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by [[City2connect]]. The line was opened on 25 December 2021. | ||
On 27 October 2024, the T10 line was updated with new lightning, relaid track around Wheatfield & Talbot Parkway, detail changes at Talbot Parkway, fixed a few points where trains could get stuck, and preparations for a new feature. | |||
==Stations== | ==Stations== | ||
*[[Centre]] ]|| (at-grade, located on an unused switch) | *[[Centre]] ]|| (at-grade, located on an unused switch) | ||
Line 13: | Line 15: | ||
*[[Talbot Parkway]] 1]||[2 (at-grade) | *[[Talbot Parkway]] 1]||[2 (at-grade) | ||
*[[Woodgrange Park]] ]||[ (at-grade, staggered) | *[[Woodgrange Park]] ]||[ (at-grade, staggered) | ||
*[[Stour Junction]] |[]|[]||[ (at-grade) | *[[Stour Junction]] |[4b 4a]⊥[32]||[1 (at-grade) | ||
Branch splits | |||
*TBA |[]⊥[]||[ (at-grade) | |||
===TBA branch=== | |||
*TBA ]| (at-grade) | |||
==Rolling stock== | |||
*3x [[QR1-Series]] | |||
[[Category:City2connect Wiki]] | [[Category:City2connect Wiki]] |