Jump to content

Editing T10

Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.

Latest revision Your text
Line 1: Line 1:
The '''T10''' is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by [[City2connect]]. The line was opened on 25 December 2021.
The '''T10''' is a suburban narrow-gauge railway line that runs between Centre and Stour Junction. It has thirteen stations, and is operated by [[City2connect]]. The line was opened on 25 December 2021.
On 27 October 2024, the T10 line was updated with new lightning, relaid track around Wheatfield & Talbot Parkway, detail changes at Talbot Parkway, fixed a few points where trains could get stuck, and preparations for a new feature.
==Stations==
==Stations==
*[[Centre]] ]|| (at-grade, located on an unused switch)
*[[Centre]] ]|| (at-grade, located on an unused switch)
Please note that all contributions to Alexrules14's Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see Alexrules14's Wiki:Copyrights for details). Do not submit copyrighted work without permission!
Cancel Editing help (opens in new window)