Editing
Cape May Line
(section)
Jump to navigation
Jump to search
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==History== The line to Cape May was built in 1894 by the Tuckahoe and Cape May Railroad, reorganized as the Cape May Railroad, and operated by the Philadelphia and Reading Railway's Atlantic City Railroad in 1901 and later Pennsylvania-Reading Seashore Lines (PRSL) in 1933. At one time, the rail line was known as "The Steel Speedway To The Shoreβ. Eventually in 1976, it became part of Conrail, which ended passenger service on the line on October 2, 1981, due to poor track conditions and limited funding from the New Jersey Department of Transportation. Freight service ended on October 10, 1983. Conrail then sold the line to New Jersey Transit as their Cape May Branch. In 1996, after the restoration of commuter rail services on the Atlantic City Line, NJ Transit rebuilt the Cape May Branch and began running passenger services on the line. In 1998, the line to Cape May was restored. On March 1, 2012, NJ Transit was notified by New Jersey State Police, advising them that theft of track material had occurred on their Cape May Branch in Dennisville. The investigating trooper informed them that several individuals associated with the theft had been arrested and charged with indictable offenses. Arrested on Monday, March 5, were a father and son team from the Villas section of Lower Township, New Jersey, along with a third individual from Rio Grande. Several days later, NJ Transit employees conducted a detailed track inspection of the entire area of the theft, which consisted primarily of the removal of tie plates and spikes. This inspection concluded that the area of the theft encompassed approximately 6,800 feet (1 1/4 miles), or 75 percent of the total number of tie plates and spikes in that particular section of track. In their actions to remove the tie plates and spikes, the perpetrators also damaged and destroyed numerous cross ties. In 2022, the vandalized part of the rail line was rebuilt with new tracks and ties; service resumed in 2024. [[Category:USA Railroads Fanon Wiki]]
Summary:
Please note that all contributions to Alexrules14's Wiki may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Alexrules14's Wiki:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
Navigation menu
Personal tools
Not logged in
Talk
Dark mode
Contributions
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
Edit
Edit source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Help about MediaWiki
Tools
What links here
Related changes
Special pages
Page information
Get shortened URL